Atlantic City Artificial Reef (2/3)

Atlantic City Artificial Reef

12.2 Nautical Miles off Atlantic City
Depth: 55-95 ft [download]

 1 2 3  







Nils S reef
Type:
artificial reef, clam dredge, USA
Built:
1948, RTC Shipbuilding, Camden NJ, USA, as Brigantine
Specs:
( 122 x 24 ft ) 178 gross tons
Sponsor:
Gifford Marine Company, Ocean City Marlin & Tuna Club, Fish America Foundation
Sunk:
Saturday April 23, 1989 - Atlantic City Artificial Reef
GPS:
39°13.610' -74°13.045'
Depth:
90 ft


Redbird Subway Car - in service
Type:
250 "Redbird" subway cars - NYC Subway system - steel bodies / frames
Built:
1959-1960 - American Car & Foundry - Model R26 # 7750-7859
1960-1961 - American Car & Foundry - Model R28 # 7860-7959
1962-1963 - St. Louis Car - Model R29 # 8570-8805
1962-1963 - St. Louis Car - Model R33 # 8806-9345
1963-1964 - St. Louis Car - Model R36 # 9346-9769
Specs:
( 51 x 9 ft ) 15,000 to 18,000 pounds (body)
Sunk:
50 cars - Cape May Reef on July 3, 2003
50 cars - Deepwater Reef on July 16, 2003
50 cars - Atlantic City Reef on July 25, 2003
50 cars - Garden State North Reef on Sept 3, 2003
50 cars - Shark River Reef on Oct 14, 2003
619 cars - Delaware Reef 11 from Aug 2001 to Nov 2003
Sponsor:
New York City Metropolitan Transportation Authority (MTA)
anti-
Sponsor:
Environmental group Clean Ocean Action lobbied aggressively and almost successfully to prevent the use of these subway cars as artificial reefs in New Jersey, resulting in most of the cars going to other states.
GPS:
too many to list, and all gone anyway
Depth:
Depths vary by location between 80 ft and 130 ft.

rock reef
A hopper barge full of rock

All manner of concrete, steel, and stone rubble from dredging, demolition projects, and other construction is used as artificial reef materials. This material is generally available at very low cost or free from construction companies who are more than happy to get rid of it. Transportation costs determine where this material is used by the Reef Program.


Atlantic City Artificial Reef

 1 2 3  

rock ridge

This site on the Shark River Artificial Reef consists of two long ridges of seven huge rock piles each, with one long valley east-west between them. Between piles, there are smaller valleys. Each ridge contains approximately two million tons ( or one million cubic yards ) of granite, blasted and dredged from the bottom of New York harbor between September 2002 and September 2003. Peak depths range from 85 to 105 ft, bottom depth is 130 ft. In addition, 15 Redbird subway cars were deposited on or near one of the piles. A single similar rockpile is located in shallower water on the Axel Carlson Reef.

Printed from njscuba.net