USS G-2 / SS-27

Shipwreck USS G-2
Type:
shipwreck, submarine, U.S. Navy
Built:
1912, Lake Torpedo Boat Company, Newport News, VA USA
Specs:
( 161 x 13 ft ) 400 tons, no crew
Sunk:
Wednesday July 30, 1919
foundered after weapons tests - 3 casualties (inspection crew)
Depth:
81 ft

(Submarine No. 27: displacement 375 (surf.), 516 (subm.); length 161'; beam 13'1"; draft 12'6"; speed 14 knots (surf.), 10 knots (subm.); complement 26; armament 6 18" torpedo tubes; class G-1)

Tuna (Submarine No. 27) was laid down on 20 October 1909 at Bridgeport, Conn., by the Lake Torpedo Boat Co.; renamed G-2 on 17 November 1911; launched on 10 January 1912; sponsored by Miss Marjorie F. Miller; towed to the New York Navy Yard after the termination of the Lake contract on 7 November 1913; and commissioned on 1 December 1913, Lt. (j.g.) Ralph C. Needham in command.

Departing New York under tow of submarine tender Ozark (Monitor No.7) the submersible torpedo boat arrived at the torpedo station, Newport, Rhode Island, on 28 February 1914. Attached to the Atlantic Submarine Flotilla, G-2 spent the next five months conducting dive training and engineering exercises with G-1 in Long Island Sound and Narragansett Bay. During these trials, the boat made six submerged runs to a maximum depth of 37 feet. Her engines proved troublesome, however, and after the port armature shaft failed on 31 March, the boat was towed to New York for repairs. While there, financial considerations led to G-2 being put in reserve commission on 15 June 1914.

G-2 was placed in full commission at New York on 6 February 1915, Lt (jg). Ralph C. Needham in command. Attached to Division Three, Submarine Flotilla, Atlantic Fleet, the boat joined G-1, Fulton (Submarine Tender No.1), and tug Sonoma, for a cruise to Norfolk on 25 March. Arriving there two days later, the submersible conducted maneuvers in Hampton Roads before proceeding to Charleston in April, arriving there on the 17th. Following a short yard period for repairs, the division proceeded back to New York, mooring alongside the 135th Street pier on 9 May.

On 18 May, G-2 joined other warships and passed in review before President Woodrow Wilson, who looked on from the yacht Mayflower. The boat then sailed to Nantucket, to participate in a war problem off Block Island, before unloading her torpedoes at Newport on 25 May. Ordered back to New York for an overhaul, the submersible again transited the familiar waters of Long Island Sound before arriving at the mouth of the East River on 22 June. While standing down the river with G-4, however, the two boats collided with submarine K-22 in an unusual three-boat accident. Fortunately, none of the boats suffered any damage. G-2 entered the Navy Yard there for an extended overhaul later that day.

Escorted to Provincetown, Mass., by tug Iwana and Ozark, G-2 commenced final acceptance trials between 1-10 December. Following those successful evolutions, during which the Trial Board noted numerous items requiring modernization, the boat moved back to New York for an overhaul on 14 January 1916. Six months later, G-2 shifted to the Lake Torpedo Boat Company yard for completion, receiving new diving rudder gear, hydroplanes, electrical wiring, and a new crankshaft. This yard work required extensive alterations and the boat did not return to service until convoyed to New London by Sunbeam II (SP-42) on 28 June 1917.

On 21 August, G-2 sailed to Boston via the Cape Cod Canal to operate with Aylwin (Destroyer No. 47), submarine chaser SC-6, and steam yacht Margaret (SP-527). There, the boat helped a Navy Experimental Board embarked in Margaret carry out various sound detector tests in nearby waters. The submarine also conducted practice approaches and served as an instruction platform for officer and enlisted submarine students.

Shifting back to New London on 20 October, G-2 combined work on sound detection devices with training for the newly established Submarine School off Block Island and in Long Island Sound. During seven months of operations, she experimented with magnetic detectors and dragging devices and tried out new periscopes and other submarine equipment. The boat carried out these tests with section patrol boats Wacondah (SP-238) and Thetis (SP-391), as well as numerous subchasers. Learning of the possible proximity of German U-boats, she conducted four-day patrols off Block Island in late June 1918 and again in mid-July.

G-2 continued schoolship duty out of New London through the end of World War I, testing listening and flare signaling devices among other pieces of equipment. On 30 August, for example, her crew tested the strength of the pressure hull, and the reliability of electric equipment, against depth charge explosions. On 12 September Thetis experimented with a magnetic detector while G-2 lay on the bottom in 86 feet of water and, in November, G-2 even conducted experimental work with patrol seaplanes. This duty ended in January 1919 when she was scheduled for inactivation.

Decommissioned on 2 April 1919, the boat was designated as a target for testing depth charges and ordnance nets in Niantic Bay, Conn. Tragically, during inspection by a six-man maintenance crew on 30 July 1919, the boat suddenly flooded and sank at her moorings in Two Tree Channel near Niantic Bay. She went down in 13-1/2 fathoms, drowning three of the inspection crew. Too deep and too old to salvage, the submarine was struck from the Navy List on 11 September 1919.

from Navy historical records


Comments on USS G-2

Questions or Inquiries?

Just want to say Hello? Sign the .

Submit a Comment

Your email address will not be published. Required fields are marked *


Click image to replace if unable to read.

Enter the digits from the image above, except for the last one:

This site uses Akismet to reduce spam. Learn how your comment data is processed.


schooner barge
A beached schooner barge. Compare the hull form with a square barge.

The schooner barge was the final development of the working sailing ship. The design originally evolved in the 1870s on the Great Lakes, where it was found that sailing ships could be more profitably towed from place to place than sailed. No longer subject to the vagaries of the wind, such trips could be made on a scheduled basis, and with reduced labor costs. The idea spread into general use, resulting in the conversion of many sailing ships into barges. Ironically, most of the vessels that were converted to schooner barges were not actually schooners, but square-rigged ships. Square-riggers, with their large and expensive crews of skilled sailors, became uneconomical to operate in the face of ever-improving steam power, while more efficient schooners managed to compete for a few years longer.

Printed from njscuba.net