Smithtown Artificial Reef

Smithtown Artificial Reef

1.6 nautical miles northwest of Stony Brook Harbor, 0.05 sq miles
Depth: 30 - 40 ft


the big one goes down
Type:
artificial reef, barges
Depth:
38 - 40 ft
Name Description Sunk GPS
190’ wood 1979 40°55.977'
-73°10.921'
350’ steel 1981 40°55.943'
-73°10.955'
270’ wood 1982 40°55.876'
-73°11.111'
340’ steel 1984 40°55.991'
-73°10.950'
80’ wood 1984 40°55.972'
-73°10.872'
80’ steel (226) 2021 40°55.970'
-73°11.048'

rock reef
A hopper barge full of rock

All manner of concrete, steel, and stone rubble from dredging, demolition projects, and other construction is used as artificial reef materials. This material is generally available at very low cost or free from construction companies who are more than happy to get rid of it. Transportation costs determine where this material is used by the Reef Program.



Type:
artificial reef, trawler, USA
Built:
1968, Marine Builders, Mobile Alabama, USA as Brothers in Law
Specs:
( 90 x 20 ft ) 135 gross tons
Sponsor:
South Jersey Artificial Reef Association
Sunk:
Friday August 11, 2023 - Cape May Artificial Reef
GPS:
38°50.694' -74°42.715'
Depth:
60 ft